Bathroom planning before you order
Bathroom projects run more smoothly when layout, plumbing and tiling decisions are settled before sanitaryware and furniture are ordered.
Lock the layout first
Decide where the bath or shower, WC and basin will sit relative to soil pipes, water feeds and the door swing. Moving drainage is possible in many homes, but it adds cost and time, so treat existing services as a starting constraint unless you are doing a full strip-out.
Allow clear access around the shower or bath and enough space to dry and dress. Storage for towels and toiletries belongs in the plan, not as leftover wall space.
Surfaces, heating and ventilation
Wall and floor finishes need to suit wet use. Large-format tiles reduce grout lines; mosaics suit niches and curves. Underfloor heating and towel rails affect both comfort and where electrics run.
Ventilation matters in every bathroom. Confirm extractor capacity and whether the room has a window that opens. Condensation problems are harder to fix after tiling is finished.
- List what you are keeping: bath, shower tray, WC, basin or none of them.
- Note ceiling height if you want a shower enclosure or wet-room screen.
- Bring tile and furniture preferences to the showroom once the layout is sketched.
How we help
Bring measurements and photos, or complete a bathroom project brief so we can prepare options. The showroom stocks bathroom furniture, sanitaryware and tiling ranges you can compare in person before ordering.
Bathroom planning specification
| Decision | Lock before ordering | Typical constraint |
|---|---|---|
| Layout | Bath/shower, WC, basin positions | Soil pipe and door swing |
| Wet zones | Shower tray or wet-room fall | Ceiling height for enclosures |
| Surfaces | Wall and floor tile format | Grout lines and niches |
| Heating | Underfloor heating or towel rail | Electrical routes |
| Ventilation | Extractor capacity and window | Condensation after tiling |
Frequently asked questions
What should I decide before ordering a bathroom?
Lock the layout first: where the bath or shower, WC and basin sit relative to soil pipes, water feeds and the door swing. Storage, tiling format and ventilation should follow that plan before sanitaryware is ordered.
Can bathroom drainage be moved?
Moving drainage is possible in many homes, but it adds cost and time. Treat existing services as a starting constraint unless you are doing a full strip-out.
Why does bathroom ventilation matter so early?
Confirm extractor capacity and whether the room has an opening window before tiling finishes. Condensation problems are harder to fix after surfaces are complete.
How does Crestwood help with bathroom planning?
Bring measurements and photos, or complete a bathroom project brief. The Lymington showroom stocks bathroom furniture, sanitaryware and tiling ranges you can compare before ordering.